Project Process · 15 Steps

From tender to aftercare — one accountable partner.

  1. 01

    Tender Award

    Kickoff, scope confirmation and dedicated PM assignment within 48 hours of award.

  2. 02

    Engineering

    In-house structural and mechanical engineering coordinated with the design team.

  3. 03

    Shop Drawings

    Sealed shop drawings issued for review with tight submittal turnaround.

  4. 04

    Material Procurement

    Mill-certified stock sourced from vetted North American and European suppliers.

  5. 05

    Laser Cutting

    Fiber laser cutting on sheet and tube — nesting optimised for minimum waste.

  6. 06

    Fabrication

    Press-brake forming, machining and sub-assembly on a scheduled production floor.

  7. 07

    Welding

    CWB-certified TIG, MIG, spot and robotic welding with weld maps and inspection.

  8. 08

    Powder Coating

    In-house pretreatment and powder line — any RAL colour, architectural durability.

  9. 09

    Assembly

    Trial fit-ups and marshalled sub-assemblies before crating for site.

  10. 10

    Quality Inspection

    Dimensional, weld and finish QA with signed reports before release.

  11. 11

    Packaging

    Purpose-built crating, tagging and shipping documentation for site handling.

  12. 12

    Delivery

    Nationwide freight coordinated to site sequencing and hoist windows.

  13. 13

    Installation

    Trained crews handling hoisting, fit-up and final commissioning.

  14. 14

    Project Closeout

    As-builts, O&M manuals and formal handover to construction manager.

  15. 15

    Warranty & Aftercare

    Documented warranty period with a single point of contact for service.