First-Article Inspection
Every new part is dimensionally validated before production release.
Every new part is dimensionally validated before production release.
Operators verify tolerances at each station using calibrated instruments.
Visual, MT and UT weld inspection with documented weld maps.
Adhesion, DFT and colour verified against project specification.
Mill certs, heat numbers and traceability records retained per project.
Every shipment released with signed QA package and photo record.
Certified welders and welding procedures under CSA W47.1 Division 2.
Quality management system aligned with ISO 9001 requirements.
Welded steel construction to CSA W59 for structural connections.
Structural steel fabrication practices aligned with AISC standards.
Welder qualifications aligned with AWS D1.1 (steel) and D1.6 (stainless).
Registered under the Canadian Controlled Goods Program (CGP).